November 2015        Back to Home        January 2016

 

__________________________________________________

Total Hours: 7.9

Hours Fabricating: 7.9

Fab Hours to Date: 653.5

__________________________

29-Dec-15
Finished resetting rivets that had been drilled out
_12_29_tryingthenewrivetgunfromdavet_small.jpg _12_31_rightspardonereadyforinspection1_small.jpg
 
30-Dec-15
The right spar was nearly finished!  All rivets were re-set, All burs and marks were sanded and polished. 
The only thing left to do is check the bolts for proper torque and get Dave G. or Peter Zwaan to come inspect it.
_12_31_rightspardonereadyforinspection2_small.jpg

Photo album created with Web Album Generator