September 2014
August 2014          Back to SONEX         October 2014          Back to Ashton Aerospace 

 

The Full Span!


 

Total Hours:               25.1

Hours Fabricating:       24.9

Fab Hours to Date:      597.2


 

30-Sep-14

Updrilled Left Spar Rib hopes (LE & TE).  Ribs were disassembled and I started to prep to drill and Ream 5 mount/attach holes.

              

 

 

27-Sep-14

Updrilled Right Rear Spar to 1/8" (pop) rivet holes.

    

 

26-Sep-14

Finished Updrilling the TE & LE Rib holes and then cleco'd the Rear spar to aft ribs for up-drilling.  ** Kristen and I discussed naming "The Mistress".... "Jolene"... Not quite sure about that one.. though it does seem interestingly and eerily appropriate.

 

25-Sep-14

Finished pilot drilling rib spacers.  Then Test fit LE & TE Ribs to spar (because I could and it was cool!).  The LE ribs were removed and I started 1/8" Up-Drilling Right Spar and Ribs

              

 

 

14-Sep-14

Continued Drilling 1/8" thick Rib Spar Spacers (W14-02).

 

15-Sep-14

Prepped and pilot drilled W14-03 rib-spar spacers

 

 

6-Sep-14

 

 

13-Sep-14

 

 

4-Sep-14

 

 

5-Sep-14

 

 

2-Sep-14

         

 