September 2014 | |
August 2014 Back to SONEX October 2014 Back to Ashton Aerospace | |
The Full Span!
|
|
|
|
30-Sep-14 Updrilled Left Spar Rib hopes (LE & TE). Ribs were disassembled and I started to prep to drill and Ream 5 mount/attach holes.
|
|
27-Sep-14 Updrilled Right Rear Spar to 1/8" (pop) rivet holes.
|
|
26-Sep-14 Finished Updrilling the TE & LE Rib holes and then cleco'd the Rear spar to aft ribs for up-drilling. ** Kristen and I discussed naming "The Mistress".... "Jolene"... Not quite sure about that one.. though it does seem interestingly and eerily appropriate. |
|
25-Sep-14 Finished pilot drilling rib spacers. Then Test fit LE & TE Ribs to spar (because I could and it was cool!). The LE ribs were removed and I started 1/8" Up-Drilling Right Spar and Ribs
|
|
14-Sep-14 Continued Drilling 1/8" thick Rib Spar Spacers (W14-02).
|
15-Sep-14 Prepped and pilot drilled W14-03 rib-spar spacers |
6-Sep-14
|
13-Sep-14
|
4-Sep-14
|
5-Sep-14
|
2-Sep-14
|
|
Back to SONEX Back to Ashton Aerospace |